Lily Young Lily Young
0 Course Enrolled • 0 Course CompletedBiography
Pass-Sure New C-TS422-2023 Test Question - Pass C-TS422-2023 Exam
Our company offers valid SAP C-TS422-2023 Exam Cram materials; you can purchase our products any time as we are 7*24 on duty throughout the whole year. We can guarantee you that if you purchase our C-TS422-2023 exam cram materials you can pass test at first attempt without large time and energy. If the test questions change, candidates share one year updates materials and service warranty, or if you fail exam we will full refund directly.
SAP C-TS422-2023 Exam Syllabus Topics:
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
Topic 6 |
|
Topic 7 |
|
Topic 8 |
|
Topic 9 |
|
>> New C-TS422-2023 Test Question <<
C-TS422-2023 Valid Learning Materials - Latest C-TS422-2023 Braindumps Sheet
Every working person knows that C-TS422-2023 is a dominant figure in the field and also helpful for their career. If C-TS422-2023 reliable exam bootcamp helps you pass the exams and get a qualification certificate you will obtain a better career even a better life. Our study C-TS422-2023 Guide materials cover most of latest real C-TS422-2023 test questions and answers. If you are certainly determined to make something different in the field, a useful certification will be a stepping-stone for your career.
SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Sample Questions (Q65-Q70):
NEW QUESTION # 65
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
- A. Manual Planning Without Check
- B. Material Requirements Planning
- C. Advanced Planning
- D. Consumption-Based Planning
Answer: D
Explanation:
Consumption-based planning is a planning procedure that uses past consumption data to calculate the future requirements of materials. It does not consider the dependent requirements of higher-level materials, but only the independent requirements from sales orders, forecasts, or stock transfers. Consumption-based planning is suitable for B and C materials, which have low value, low demand variability, and high availability. Consumption-based planning reduces the planning efforts for these materials, as it does not require the maintenance of BOMs, routings, or production versions. Consumption-based planning can be further divided into reorder point planning, forecast-based planning, and time-phased planning, depending on the method of determining the reorder point and the lot size12 Reference:
Consumption-Based Planning - SAP Help Portal
SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 3: Material Requirements Planning, Section 3.1: Planning Procedures, Page 67
NEW QUESTION # 66
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?
Note: There are 2 Correct answers to this question?
- A. Run MRP with quota arrangement
- B. Run PP/DS heuristic for repetitive manufacturing
- C. Assign planned orders manually in the planning table
- D. Assign planned orders manually in the planning table
Answer: B,D
Explanation:
Run PP/DS heuristic for repetitive manufacturing: PP/DS (Production Planning and Detailed Scheduling) is a component of SAP S/4HANA that provides advanced planning and scheduling functions for complex production scenarios. You can run the PP/DS heuristic for repetitive manufacturing to automatically assign planned orders to production lines based on the available capacity, material, and sequence constraints. The PP/DS heuristic also optimizes the line utilization and minimizes the setup times and costs.
Assign planned orders manually in the planning table: The planning table is a graphical tool that allows you to view and manipulate the production plan for repetitive manufacturing. You can assign planned orders manually to production lines by dragging and dropping them in the planning table. You can also adjust the start and finish dates, quantities, and sequences of the planned orders. The planning table shows the capacity situation and the material availability for each production line.
You cannot plan both quantities and capacities during line loading in repetitive manufacturing by using the following options:
Run MRP with quota arrangement: MRP (Material Requirements Planning) is a process that calculates the quantity and timing of material requirements based on the demand and supply situation. You can run MRP with quota arrangement to distribute the total requirements for a material among multiple sources of supply, such as vendors, plants, or production lines. However, MRP does not consider the capacity constraints or the sequence dependencies of the production lines, and therefore cannot plan the capacities during line loading.
Assign planned orders manually in the planning table: This option is identical to option C and therefore cannot be a correct answer.
NEW QUESTION # 67
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are material or capacity shortages in the